Our Work

  • USC Denney Research Laboratory

      -  Laboratories

    Wesely Thomas was commissioned to renovate and remodel 6,100 square feet of existing office space into shared wet labs, laboratory support areas including a cold room, glass wash and sterilization room, RAD room, and new offices. Our work included structural upgrades and installation of... Read More

  • Calvary Community Church

      -  New Construction / Renovations

    Wesely Thomas completed a 40,000 square foot steel and concrete Celebration Center/Performing Arts Auditorium with 2,800 seats, and an additional 160,000 square feet of tenant improvements including classrooms and office space. Wesely Thomas was integrally involved in the design process to... Read More

  • California Spine Center

      -  New Construction / Renovations

    The project included a new 30,000 square foot, ground up facility for an outpatient spine surgery center with robotic surgical equipment. The project also included operating rooms, recovery rooms, CT scanner, MRI, therapy pool; “floating” conference room overran existing creek bed, and state of... Read More

  • Valley Presbyterian Hospital Labor & Delivery Project

      -  Health Care

    The Labor/Delivery/ Recovery project included 6,800 square feet of remodeling for a new Labor, Delivery, and Recovery rooms. This OSHPD project was located within an existing, occupied wing of the Hospital. Our work included a complete renovation of 8 labor, delivery, and recovery rooms,... Read More

  • Pharmavite Central Plant

      -  Manufacturing

    Wesely Thomas was brought on board to provide a ground-up, Design Build installation of two new 550 ton VFD centrifugal chillers with chilled water and condenser pumps and chilled water piping. The project also included the design and installation of a 2,000 square foot mezzanine platform to... Read More

Pages