Our Work

  • Amgen B6 Next Generation Filler

      -  Laboratories

    Convert shell space to a process development lab to house two new prototype “state of the science” vial and syringe filler equipment line units. The scope of work was a complete buildout including HVAC, plumbing, data/communications, power and a variety of process gas utilities. In addition, a... Read More

  • Pharmavite San Fernando Micro Lab

      -  Laboratories

    The project included relocating the lab glass washroom across main hallway into a lab storage room. Install a vertical carousel for storing all tool room’s tooling, reconfigure and increase micro lab area to include tool room area. Installation of new air conditioning units and exhaust fans.

  • Caltech Dabney Hall Basement Renovation

      -  New Construction / Renovations

    Caltech commissioned the Wesely Thomas Design/Build team to convert a portion of the library space in the Dabney Hall building into Post Doctorate and student office spaces for the Humanities and Social Sciences division (HSS). The project comprises approximately 3,180 square feet and our goal... Read More

  • PepsiCo Kevita Elevar

      -  Manufacturing

    The project scope consisted of a new pH Neutralization system installed in a new pH Shed building located alongside the existing building in the parking area lot and a new interior building Lift Station pump room located inside the plant.
    The new pH Neutralization system skid and storage... Read More

  • Caltech Tissot Laboratory

      -  Laboratories

    Lab space renovated for a trace metal cleanroom suite and a separate dedicated area for mass spectrometers. The project includes a class-1000 cleanroom utilizing corrosive-free equipment and materials due to research procedures involving perchloric acids; and also includes specialized mechanical... Read More

Pages