-
Caltech Hutzler Laboratory
- LaboratoriesWesely Thomas and Lundstrom & Associates recently completed a Design/Build research lab for Professor Nick Hutzler, Assistant Professor in the Caltech division of Physics, Mathematics, and Astronomy (PMA) at Caltech. The project is located in the Downs-Lauritsen Building and comprises 2,030
-
Caltech Keck Laboratory
- LaboratoriesThe project included a 3,300 square foot renovation of existing laboratory space in the W.M. Keck building to create a bio engineering lab featuring light microscopes, atomic force microscopes, and a gel station for purifying DNA to support research in cell programming and neural network
-
Caltech Hsieh Laboratory
- LaboratoriesThis renovation on the George W. Downs building included renovation of 1,940 square feet of existing lab space to create a laser and HE-3 optical cryostat laboratory to facilitate research in the filed of quantum physics.
-
Calvary Community Church
- New Construction / RenovationsWesely Thomas completed a 40,000 square foot steel and concrete Celebration Center/Performing Arts Auditorium with 2,800 seats, and an additional 160,000 square feet of tenant improvements including classrooms and office space. Wesely Thomas was integrally involved in the design process to
-
California Spine Center
- New Construction / RenovationsThe project included a new 30,000 square foot, ground up facility for an outpatient spine surgery center with robotic surgical equipment. The project also included operating rooms, recovery rooms, CT scanner, MRI, therapy pool; “floating” conference room overran existing creek bed, and state of
BUILDING CONFIDENCE SINCE 1987
OFFICES IN VENTURA COUNTY & SOUTH BAY