Skip to content

License #509719

  • Request Info
Wesely Thomas General Contractor Logo
  • Services
    • Pre-Construction Analysis
    • Conceptual Budgeting
    • Value Engineering
    • Constructability Review
    • Bidding
    • Construction Management
  • Industries
    • Healthcare
    • Biopharma & Life Science
    • High-Tech Manufacturing
    • Institutional
  • Projects
  • About
    • Core Values
    • We Care
    • Executives
    • FAQs
    • Legacy Projects
  • Clients
  • Careers
  • Contact
Wesely Thomas General Contractor Logo

Central Sterile Processing Dept. Equipment Upgrade

Valley Presbyterian Hospital

  – Van Nuys, CA

Valley Presbyterian Hospital Logo

Upgrading Critical Hospital Equipment

Project scope upgraded the entire sterile processing department, including equipment replacement, several critical utility upgrades and finishes. The project was completed in 4 phases, providing substantial code upgrades for existing MEP utilities. We installed a new compressor, air dryer, ultrasonic cleaner, 2 washers with conveyor system, 2 steam sterilizers and tied all the pieces into plant utilities. Project scope also included a department wide fire alarm and fire sprinkler upgrade. The existing RO system supporting the sterilization equipment for the sterile processing department was frequently failing. Our team assisted the design team to fast-track design documents while performing equipment replacement work in the dept. As a part of this project, our team completed an electrical service upgrade in the basement, installed new panels, step down transformers, performed equipment upgrades to support E-power and completed the RO system replacement scope. The existing RO room footprint had to be expanded to support the new design, which required additional fi re life safety and code compliance work as well as updating all the finishes to match the other recently renovated areas.

Client

Valley Presbyterian Hospital

Location

Van Nuys, CA

Size

7,200 SF

Completion Date

2021

Other Details

Industry

  • Healthcare

Services

  • Value Engineering
  • Pre-Construction Analysis
  • Construction Management
  • Conceptual Budgeting
Valley Presbyterian Hospital Central Sterile Processing Dept. Equipment Upgrade
Valley Presbyterian Hospital Central Sterile Processing Dept. Equipment Upgrade
Valley Presbyterian Hospital Central Sterile Processing Dept. Equipment Upgrade
Valley Presbyterian Hospital Central Sterile Processing Dept. Equipment Upgrade

Building confidence since 1987

CBS Logo
Nusano Logo
Caltech Logo
Getty Logo
Wesely Thomas General Contractor Logo

License #509719

Main Office

2545 W Hillcrest Drive, Suite 205
Newbury Park, CA 91320

[email protected]

805-379-2365

Follow Us
Facebook-square Linkedin-in Instagram

Stay In Touch

Name

General Info

  • Home
  • About
  • Projects
  • Clients
  • Careers
  • Contact
  • Home
  • About
  • Projects
  • Clients
  • Careers
  • Contact

Services

  • Pre-Construction Analysis
  • Conceptual Budgeting
  • Value Engineering
  • Constructability Review
  • Bidding
  • Construction Management
  • Pre-Construction Analysis
  • Conceptual Budgeting
  • Value Engineering
  • Constructability Review
  • Bidding
  • Construction Management

Industries

  • Healthcare
  • Biopharma & Life Science
  • High-Tech Manufacturing
  • Institutional
  • Healthcare
  • Biopharma & Life Science
  • High-Tech Manufacturing
  • Institutional

Terms of Use | Privacy Policy | Accessibility Statement    ©2025 copyright Wesely Thomas

Website Design & Development

Thinking2 A Web Design Firm Logo