The project scope consisted of a new pH Neutralization system installed in a new pH Shed building located alongside the existing building in the parking area lot and a new interior building Lift Station pump room located inside the plant.
The new pH Neutralization system skid and storage tank were located in the pH Shed. The process water collection pit, twin pumps, and filter skid were located in the Lift Station room. All of the process equipment was designed, manufactured, and furnished by Wastech.