The scope of work consisted of the renovation of an existing 2,150 GSF suite to upgrade the manufacturing process. Architectural modifications were limited and included selective demolition of interior partitions and finishes. The suite’s classification was re-designated from Grade ‘B’ to Grade ‘C’ to align with revised operational requirements. The installation of standalone isolators was incorporated to optimize process containment, workflow efficiency, and compliance with current GMP standards.